Atalaya Towers



The Blog

Check back here often to see what we have updated.

Atalaya Blog

Day 10 Florence Recovery

Submitted by atalaya on Tue, 09/25/2018 - 10:04


Last night the re-built drives arrived, and the techs began to re-install. Today they will be tested in hopes that all is good. We will post that information as soon as this afternoon.


FSA was here to remove the last of their equipment with the only thing remaining is the re-install of carpet padding in various units.


Watkins started pressure washing the eastside of the building to begin the waterproofing project.

Posted in:
comments powered by Disqus